Application forms for the 1959 Act or 2003 Act are available under the appropriate headings.
All Guidance Notes are for the 2003 Act
The purpose of Building Regulations is to set down minimum requirements that must be observed by anyone planning to construct, alter or change the use of a building. The ways in which these regulations may be satisfied are set down in the Technical Standards. The Building Control & Public Safety Service is charged with the responsibility of ensuring that the requirements of the Building Regulations and the Technical Standards are met.
How to apply for a Building Warrant, staged warrant, relaxation, amendment, or extension:
|
|
|
Forms: 2003 Act
Forms: 1959 Act
Guidance Notes:
Contact Us:
Building Control and Public Safety Development & Regeneration Services 231 George Street Glasgow G1 1RX
Phone: 0141 287 5703 Fax: 0141 287 5588 Email: building.control@drs.glasgow.gov.uk
Office Hours:
9.00 am – 5.00 pm, Monday to Thursday 9.00 am – 4.00 pm, Friday
|