Location:

Renfield Street and West George Street

Expected Work Start Date:

Thursday 30 July 2020

Expected Work Completion Date:

Friday 31 July 2020

Measure(s):

 

 

The kerbside parking/ loading lane will be suspended at the following locations: -

· Renfield Street - Full length, both sides

· West George Street - (from Wellington Street to Renfield Street)

 Renfield St/W Geo St

Purpose:

To allow the widening of the existing footways to enable physical distancing.

Detail:

The temporary works will be in place from Thursday 30 July 2020 for a minimum period of 10 weeks and reviewed in line with the Scottish Government's Covid-19 Framework for Decision Making 'Scotland's Route Map through and out of the crisis'.