Project: | Spaces for People |
Location: | Tollcross Road - from a point 50 metres west of the extended west kerbline of Crail Street, to Maukinfauld Road Tollcross Road - between Wellshot Road and Anworth Street |
Expected Work Start Date: | 20 July 2020 |
| |
Measure(s): | - Tollcross Road: south side of carriageway within the lay-by (west of Ogilvie Street) there will be approximately 10 metres of extended footway.
- Tollcross Road: south side of carriageway within the lay-by (east of Ogilvie Street) there will be approximately 27 metres of extended footway.
- Tollcross Road: south side of carriageway within the lay-by (opposite the junction of Murrayfauld Drive), there will be approximately 20 metres of extended footway.
- Tollcross Road: north side of carriageway within the lay-by (east of Wellshot Road) there will be approximately 20 metres of extended footway.
- Approximately 12 metres of no waiting at any time restrictions in the form of double yellow lines will be installed east of the footway widening works.
- Tollcross Road: north side of carriageway within the lay-by (immediately east of Altyre Street) there will be approximately 17 metres of extended footway.
- Approximately 20 metres of no waiting at any time restrictions in the form of double yellow lines will be installed within the lay-by adjacent to Nos. 997-1007 Tollcross Road.
- Tollcross Road: south side of carriageway within the lay-by (between Altyre Street and Dalness Street) there will be approximately 46 metres of extended footway
- Approximately 19 metres of no waiting at any time restrictions in the form of double yellow lines will be installed east of the footway widening works.
- Tollcross Road: north side of carriageway within the lay-by (east of Dalness Street) there will be approximately 28 metres of extended footway.
- Approximately 15 metres of no waiting at any time restrictions in the form of double yellow lines will be installed east of the footway widening works.
- Tollcross Road: south side of carriageway within the lay-by (east of Dalness Street) there will be approximately 40 metres of extended footway.
- Approximately 14 metres of no waiting at any time restrictions in the form of double yellow lines will be installed east of the footway widening works.
- A further 16 metres of extended footway works will be installed immediately east of the proposed double yellow lines.
|
Detail: | The temporary works will be in place from Monday 20 July 2020 for a minimum period of 10 weeks. The temporary works will be reviewed in line with the Scottish Government's Covid-19 Framework for Decision Making 'Scotland's Route Map through and out of the crisis'. |
Images of temporary measures following installation:
Update: 14 December 2020
Spaces for People infrastructure is temporary and as such, agile. Measures can be mobilised relatively quickly as the need arises, and adjustments made to existing infrastructure after a period of review.
Following a monitoring period at this location, the temporary infrastructure has been removed.
Update: 16 September 2021
Following an independent review which recommended the retention of those Spaces for People measures that could realise long term sustainability and active travel benefits - temporary footway widening infrastructure across neighbourhoods will not be reinstated at this location/made permanent.